Free Printable Templates for Field Leads

Four free templates that work for any trade and any company. Each one fits on one letter-size page, comes as a PDF to print and a Word file you can edit, and has a grey example in every field so you know what to write.

Want all 7 templates plus a first-week checklist and 20 AI prompts? Get the free Foreman Starter Pack.

Daily report

How to use: fill it out at the end of every shift and send it before you leave. Same order every day. Download PDF · Download Word · Fill it in online

Company / Project: ______ Location / Area: ______ Date: ______ Prepared by: ______ Weather: ______ Shift hours: ______

  1. Heads up (anything that affects schedule, cost, or safety, or "Nothing new to flag"): Example: Material delivery is late, may lose half a day.
  2. Crew on site (role, headcount, hours): Example: Installers, 4, 8 hours each.
  3. Work completed (what, where, how much): Example: Installed 120 ft of pipe in Room 104. About 80% done.
  4. Problems and what you did: Example: Wrong part delivered. Called supplier. New part arrives tomorrow 7 AM.
  5. Safety (talks, near misses, incidents): Example: Morning talk on ladder use. No incidents.
  6. Tomorrow and needs: Example: Finish Room 104. Need a lift by 7 AM.

Delay notice (5 Ws)

How to use: fill it out the same day work gets held up. Facts only, no blame. Send it and keep a copy. Download PDF · Download Word · Fill it in online

Company / Project: ______ Location / Area: ______ Date: ______ Prepared by: ______ Sent to: ______ Notice #: ______

  • Who is held up, and who or what caused it: Example: Our crew of 5. Waiting on another contractor.
  • What work stopped or slowed: Example: Wall install in Area 2 stopped.
  • When it started, how long so far, how long expected: Example: Tuesday 7 AM. 1 day so far, 2 expected.
  • Where on site: Example: Building 1, Level 2, Room 210.
  • Why it happened, and what you did about it: Example: Material not delivered. Moved crew to other work.
  • Impact on time, crew, and cost: Example: 5 workers moved for 8 hours.

What I need, and by when: Example: A decision on overtime by Thursday 12 PM.

Toolbox talk and sign-in

How to use: talk for about 5 minutes on one topic, ask the crew a question, then everyone prints and signs. Download PDF · Download Word

Company / Project: ______ Location: ______ Date and time: ______ Led by: ______ Topic: ______ Length: ______

Key points (aim for 3): Example: 1. Check the ladder before you climb. 2. Keep 3 points of contact. 3. Don't stand on the top step.

Questions or concerns raised:

# Name (print) Company or crew Signature
1
2
3

Shift handoff

How to use: fill it out before you leave. The next shift should be able to start without calling you. Download PDF · Download Word

Company / Project: ______ Location / Area: ______ Date: ______ Outgoing lead: ______ Incoming lead: ______ Shift / time: ______

  • Work status (done, in progress, not started): Example: Room 104 done. Room 105 half done.
  • Hazards, permits, and lockouts in place (write them out in full): Example: Lockout on Panel 2, tag #14, still on.
  • Equipment and tools: Example: Lift #2 needs charging.
  • Materials: Example: Fittings short, on order.
  • Next tasks, in order: Example: 1. Finish Room 105. 2. Start Room 106.
  • Who to call: Example: Supervisor and phone number.